node
fidic-contracts-training-course-module-4-ghana-6-7-november-2017
Engineers Centre, Roman Ridge
The 1999 FIDIC Conditions of Contract are being increasingly used by the international Construction Industry throughout the World. The Multi-Lateral Development Banks, including the World Bank, Inter -American Development Bank & Caribbean Development Bank have adopted the 1999 FIDIC Conditions of Contract for Construction with modifications known as Harmonised Construction Contract.
Module 4: It explains and illustrates the use of the FIDIC Conditions of Contract for Construction (the “Construction Contract”) and the FIDIC Conditions of Contract for Plant and Design-Build (the “Design-Build Contract”). The course is designed to help the participants have confidence in working with these documents whether representing Employers, Consultants or Contractors.
Tel. no. +233 307 038 379, +233 269 019 476
E-mail: [email protected]